NERC MYTO 2 Retail Tariffs (June 2014) Enugu Electricity Distribution Company Tariff Codes For Consumers Of Electricity

OLD

TARIFF CODES (2011)

NEW TARIFF CODES

(2012)
ENERGY CHARGE PER Kwh (=N=)

FIXED CHARGE

PER MONTH (=N=)
SOURCES OF SUPPLY & TYPE OF METER (DESCRIPTION)

CUSTOMER’S DEMAND LEVELS

1
RESIDENTIAL
1.1 R1 R1 4.00 - Single phase supply with single phase meter with consumption on 50KWH &below <5kVA;<50kwH
1.2 R2 R2S 16.44 650.00 Single phase supply with single phase meter with consumption above 50KWH >5KVA<15kVA
1.3 R3 R2T 16.44 650.00 Three phase supply with three phase meter with consumption below 45kVA >15KVA<45kVA
1.4 R4 R3 24.60 24,423.64 Three phase supply with three phase meter; LV Maximum Demand >45KVA<500kVA
1.5 R5 R4 24.60 117,416.46 Large three phase residential supply on 6.6/11KV and/or 66/33KV with load above 500KVA; HV MD >500kVA<2mva
2
COMMERCIAL
2.1 C1 C1S 18.14 650.00 Single phase commercial supply with single phase meter with load not exceeding 15kVA >5kVA<15kVA
2.2 C2 C1T 18.14 650.00 Three phase commercial supply with three phase meter with load not exceeding 45kVA >15KVA<45kVA
2.3 C3 C2 22.87 22,141.18 Three phase commercial supply and with load not exceeding 500kVA; LV Maximum Demand >45kVA<500kVA
2.4 C4 C3 22.87 106,446.50 Three phase commercial supply on 66/33KV with load above 500KVA; HV MD >500kVA<2mva
3
INDUSTRIAL
3.1 D1 D1S 18.45 1,300.00 Single phase industrial supply with single phase meter with load below 15KVA >5kVA<15kVA
3.2 D2 D1T 18.45 1,300.00 Three phase industrial supply with three phase meter with load below 45KVA >15kVA<45kVA
3.3 D3 D2 23.97 104,732.81 Industrial customers on three phase supply with load above 45KVA;on three phase energy meters with load below 500KVA; LV Maximum Demand >45kVA<500kVA
3.4 D4 D3 23.97 106,446.50 Large three phase industrial supply on 6.6/11KV and/or 66/33KV with load above 500KVA; HV MD >500kVA
3.5 D5 D3 Large three phase industrial supply on 6.6/11KV and/or 66/33KV with load above 500KVA; HV MD >2mVA
4
SPECIAL
4.1 A1 A1S 20.31 650.00 Religious house, Agro-allied enterprises involving crop cultivation and/or livestock farming with single phase supply with load above 5kVA; and below 15kVA >5kVA<15kVA
4.2 A2 A1T 20.31 650.00 Religious houses, Agro-allied enterprises involving crop cultivation and/or livestock farming with three phase supply with load above 15kVA and below 45kVA >15kVA<45kVA
4.3 A3 A2 20.31 37,500.00 Universities etc and Government Hospitals with load above 45kVA and below 500kVA; LV Maximum Demand >45kVA<500kVA
4.4 A4 A3 20.31 46,934.74 Universities etc and Government Hospitals on 6.6/11KV and/or 66/33KV with load above 500kVA; HV MD >500kVA
5
STREET LIGHTING
5.1 S1 S1 15.58 650.00 Street lighting Tariff 1-Ph.,3Ph.