TARIFF CODES

OLD ENERGY CHARGE PER Kwh (=N=)
NEW ENERGY CHARGE PER Kwh (=N=)

FIXED CHARGE

PER MONTH (=N=)
SOURCES OF SUPPLY & TYPE OF METER (DESCRIPTION)

CUSTOMER’S DEMAND LEVELS

1
RESIDENTIAL
1.1 R1 4.00 4.00 - Single phase supply with single phase meter with consumption on 50KWH &below <5kVA;<50kwH
1.2 R2S 16.44 20.89 650 Single phase supply with single phase meter with consumption above 50KWH >5KVA<15kVA
1.3 R2T 16.44 20.89 650 Three phase supply with three phase meter with consumption below 45kVA >15KVA<45kVA
1.4 R3 47.89 31.26 24,424 Three phase supply with three phase meter; LV Maximum Demand >45KVA<500kVA
1.5 R4 47.89 31.26 117,416 Large three phase residential supply on 6.6/11KV and/or 66/33KV with load above 500KVA; HV MD >500kVA<2mva
2
COMMERCIAL
2.1 C1S 35.32 23.05 650 Single phase commercial supply with single phase meter with load not exceeding 15kVA >5kVA<15kVA
2.2 C1T 35.32 23.05 650 Three phase commercial supply with three phase meter with load not exceeding 45kVA >15KVA<45kVA
2.3 C2 44.51 29.05 22,141 Three phase commercial supply and with load not exceeding 500kVA; LV Maximum Demand >45kVA<500kVA
2.4 C3 44.51 29.05 106,446 Three phase commercial supply on 66/33KV with load above 500KVA; HV MD >500kVA<2mva
3
INDUSTRIAL
3.1 D1S 35.91 23.44 1,300 Single phase industrial supply with single phase meter with load below 15KVA >5kVA<15kVA
3.2 D1T 35.91 23.44 1,300 Three phase industrial supply with three phase meter with load below 45KVA >15kVA<45kVA
3.3 D2 46.66 30.45 26,183 Industrial customers on three phase supply with load above 45KVA;on three phase energy meters with load below 500KVA; LV Maximum Demand >45kVA<500kVA
3.4 D3 46.66 30.45 106,446 Large three phase industrial supply on 6.6/11KV and/or 66/33KV with load above 500KVA; HV MD >500kVA
3.5 D3 46.66 30.45 106,446 Large three phase industrial supply on 6.6/11KV and/or 66/33KV with load above 500KVA; HV MD >2mVA
4
SPECIAL
4.1 A1S 39.54 25.81 650 Religious house, Agro-allied enterprises involving crop cultivation and/or livestock farming with single phase supply with load above 5kVA; and below 15kVA >5kVA<15kVA
4.2 A1T 39.54 25.81 650 Religious houses, Agro-allied enterprises involving crop cultivation and/or livestock farming with three phase supply with load above 15kVA and below 45kVA >15kVA<45kVA
4.3 A2 39.54 25.81 37,500 Universities etc and Government Hospitals with load above 45kVA and below 500kVA; LV Maximum Demand >45kVA<500kVA
4.4 A3 39.54 25.81 46,935 Universities etc and Government Hospitals on 6.6/11KV and/or 66/33KV with load above 500kVA; HV MD >500kVA
5
STREET LIGHTING
5.1 S1 30.32 19.79 650 Street lighting Tariff 1-Ph.,3Ph.

 